Terry53029
Level 14
Level 14
The tank would be part of plumbing, but I thank the leach bed is ground improvement as they prepare the ground to let waste drain into, and that is the costly part. I think I would split it into 15yr for bed and 27.5/39 for tank  
0 Cheers