gibsonrr
Level 2

Well, I didn't have it linked and that was part of the problem so thanks for that. The number of qualified days was blank so that was ok. The other problem was the program picked up the date I had in the asset worksheet when it became a rental rather than the date they bot the property. So when I entered that in the asset worksheet, that accepted the exclusion. Thanks for guiding me to the solution..