sheri414
Level 3

Thanks. Looks so stupid to have a schedule that is blank except to say see next page.  Plus we want to add our own verbiage but it looks like the only way to do that is insert a line at the top of the data entry screen and then just leave a blank line before the actual detail.  

0 Cheers